Heathrow Cargo Warehouse Bridge Gantry – Case Study

The project

Air cargo handling systems specialists, BDP Solutions, chose ECEX to assist with the design, fabrication and site installation of a 10m x 4m bridge gantry and stairs over conveyor equipment at a major Heathrow cargo centre.

The solution

ECEX Fabrication Director Paul Leese explains: “following a detailed site survey, all components were designed and fabricated off-site in ECEX’s new Newbury (Berkshire) facility, then transported to site in manageable kit form for final assembly on site. Working between the site’s 24/7/365 cargo schedules, we carried out the site installation without fuss or disruption to site operations”.