ECEX Case Studies

Archives

Look out for us in the September issue of Health and Safety at Work Magazine

Our full page advertisement is in the September issue of the Health and Safety at Work magazine this month! Grab this month’s issue or visit their full website now: http://www.healthandsafetyatwork.com/hsw/  

Continue Reading

Camera Platform: Wimbledon

ECEX designed and installed several bespoke access solutions so that the BBC camera crew could get the best possible shots of the courts. Platforms were suspended from No.1 court and hidden in flower beds so that the camera crew were out of sight and did not interfere with the matches being played.

Continue Reading

Drink spillage prevention: Twickenham Stadium

Brief: To prevent drink spillages from the mid-tier balcony, protecting to the newly installed LED screens and associated cables between the rear of the screen and the mid-tier wall. The solution must still allow the LED installation team to gain access to the control panels as required. Work carried out: ECEX designed, fabricated and installed []

Continue Reading

Bespoke metalwork fabrication: Out with the old, in with the…old?

We’ve carried out countless installations of roof edge protection in our time and, whether free-standing or fixed tubular guard rail, we are able to recommend the solution that is most suitable and cost effective for your required application. However, what do you do when you’re told that you can’t modify the aesthetic of a building? We []

Continue Reading