ECEX Case Studies

Archives

ECEX featured in Heating, Ventilation and Plumbing Magazine: Safe Access for Maintenance Engineers

ECEX has been featured on the Heating, Ventilation and Plumbing Magazine website, discussing the importance of safe access for maintenance engineers: “When it comes to purpose-built water systems such as cooling towers, evaporative condensers and water storage tanks, the consequences of an outbreak of Legionnaires’ Disease can be catastrophic. Lives may be lost, fines and []

Continue Reading

Installation complete: Free standing edge protection to reduce the risk of falling

ECEX recently completed an installation of free standing edge protection in several locations at a site in Uxbridge. The objective was to minimise the fall risk for personnel carrying out routine maintenance on site. With falls from height being the most common cause of workplace fatality, it’s important that all exposed edges and risks are []

Continue Reading

Various metalwork fabrication services: Royal Albert Hall

ECEX replaced and installed new stepover platforms, walkways and free-standing guardrail to the roof. Providing safe, long term solutions for the maintenance team so that the plant and roof can be accessed in confidence in years to come.

Continue Reading
Group_Brand-158