ECEX Case Studies

Archives

ECEX featured in Heating, Ventilation and Plumbing Magazine: Safe Access for Maintenance Engineers

ECEX has been featured on the Heating, Ventilation and Plumbing Magazine website, discussing the importance of safe access for maintenance engineers: “When it comes to purpose-built water systems such as cooling towers, evaporative condensers and water storage tanks, the consequences of an outbreak of Legionnaires’ Disease can be catastrophic. Lives may be lost, fines and []

Continue Reading

Camera Platform: Wimbledon

ECEX designed and installed several bespoke access solutions so that the BBC camera crew could get the best possible shots of the courts. Platforms were suspended from No.1 court and hidden in flower beds so that the camera crew were out of sight and did not interfere with the matches being played.

Continue Reading
Group_Brand-288

Drink spillage prevention: Twickenham Stadium

Brief: To prevent drink spillages from the mid-tier balcony, protecting to the newly installed LED screens and associated cables between the rear of the screen and the mid-tier wall. The solution must still allow the LED installation team to gain access to the control panels as required. Work carried out: ECEX designed, fabricated and installed []

Continue Reading
015

Various metalwork fabrication services: Royal Albert Hall

ECEX replaced and installed new stepover platforms, walkways and free-standing guardrail to the roof. Providing safe, long term solutions for the maintenance team so that the plant and roof can be accessed in confidence in years to come.

Continue Reading
Group_Brand-158