Camera Platform: Wimbledon

Brief

To provide an access solution so that the BBC can get optimum coverage of The Championships, Wimbledon.

Work carried out

ECEX designed and installed several bespoke access solutions so that the BBC camera crew could get the best possible shots of the courts. Platforms were suspended from No.1 court and hidden in flower beds so that the camera crew were out of sight and did not interfere with the matches being played.

“ECEX have carried out various projects for the All England Lawn Tennis Club over the last few years. We have always found their team at all levels very professional and adaptable in resolving any problems and so able to provide the Club with a solution to fully meet our requirements. Their installation teams have always been extremely courteous and left a safe clean site on completion of their work.”

Buildings & Services Manager, AELTC.

Before & During construction photos

After photos